ITAC Assessment: MZ0303
ITAC logo
ITAC Assessment: MZ0303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Plastic roof vents
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 154
Plant Area 140,000
ft2
Annual Production 23,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $469,256 6,898,400
kWh
Electricity Demand $126,211 16,676
kW-mo/yr
Waste Disposal Costs
Water Usage $13,265 1,263
Tgal
Water Disposal $8,594 1,263
Tgal
TOTAL YEARLY COSTS $617,326
RECOMMENDED SAVINGS* $117,109 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $117,109

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $35,170 $360 $30,931
409,269
kWh
$4,239
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $1,308 $6,600 $1,135
16,689
kWh
$173
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,695 $19,524 $3,695
54,340
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,814 $320 $4,177
61,435
kWh
$637
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $363 $60 $315
4,637
kWh
$48
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $24,474 $14,349 $18,840
277,056
kWh
$3,361
-
kW-mo/yr
- $2,273
07 3.4116: Meter recycled water (to reduce sewer charges) $3,124 $4,744 - - $3,124
-
Tgal
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $2,022 $5,800 $1,542
22,698
kWh
$480
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $42,139 $30,100 $42,139
619,685
kWh
- - -
TOTAL RECOMMENDED $117,109 $81,857 $102,774
1,465,809
kWh
$8,938
-
kW-mo/yr
$3,124
-
Tgal
$2,273
TOTAL IMPLEMENTED $117,109 $81,857 $102,774
1,465,809
kWh
$8,938
-
kW-mo/yr
$3,124
-
Tgal
$2,273
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs