Assessment Year | 2020 |
---|---|
Principal Product | stainless steel tanks |
NAICS | 332420: Metal Tank (Heavy Gauge) Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
727,364
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $634,471 | 7,874,790 |
kWh
|
$0.081 | |
Natural Gas | $170,509 | 31,558 |
MMBtu
|
$5.40 | |
Waste Disposal Costs | |||||
Water Usage | $5,704 | 266 |
Tgal
|
$21.48 | |
TOTAL YEARLY COSTS | $810,684 | ||||
RECOMMENDED SAVINGS* | $110,755 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $53,745 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,599 | $34,694 |
$26,599
328,369
kWh
|
- | |
02 | 2.7135: Install occupancy sensors | $4,700 | $3,360 |
$4,700
58,027
kWh
|
- | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $52,781 | $20,000 |
$(-5,399.0)
(-66,657)
kWh
|
$58,180
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,272 | $240 |
$8,272
102,128
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,280 | $550 |
$4,280
52,839
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $4,658 | $3,500 |
$4,658
57,509
kWh
|
- | |
07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,773 | $1,390 | - |
$1,773
-
MMBtu
|
|
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,561 | $360 | - |
$4,561
-
MMBtu
|
|
09 | 2.2136: Install / repair insulation on steam lines | $675 | $322 | - |
$675
-
MMBtu
|
|
10 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $2,456 | $9,000 | - |
$2,456
-
MMBtu
|
|
TOTAL RECOMMENDED | $110,755 | $73,416 |
$43,110
532,215
kWh
|
$67,645
-
MMBtu
|
||
TOTAL IMPLEMENTED | $53,745 | $43,026 |
$48,509
598,872
kWh
|
$5,236
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs