ITAC Assessment: GT0445
ITAC logo
ITAC Assessment: GT0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product WOOD PRESERVATIVES
NAICS
n/a
SIC 2861: Gum and Wood Chemicals
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 70,000,000
lb
Production Hrs. Annual 6,100
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,603 3,574,443
kWh
Natural Gas $32,267 7,897
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,882 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,882

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $484 $129 $484
5,275
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $826 $700 $826
14,947
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $290 $780 $290
15,533
kWh
-
04 2.4133: Use most efficient type of electric motors $295 $1,038 $295
5,569
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $217 - $217
3,810
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,410 $500 - $1,410
-
MMBtu
08 2.8114: Change rate schedules or other changes in utility service $2,360 $99 $2,360
-
kWh
-
TOTAL RECOMMENDED $5,882 $3,246 $4,472
45,134
kWh
$1,410
-
MMBtu
TOTAL IMPLEMENTED $5,882 $3,246 $4,472
45,134
kWh
$1,410
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs