ITAC Assessment: CC0045
ITAC logo
ITAC Assessment: CC0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Injection molded plastic components and parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 65
Plant Area 37,000
ft2
Annual Production 50,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,109 1,828,337
kWh
Electricity Demand $15,799 3,400
kW-mo/yr
Electricity Fees $19,810 -
TOTAL YEARLY COSTS $142,718
RECOMMENDED SAVINGS* $14,322 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2612: Use cooling tower water instead of refrigeration $5,893 $22,703 $5,506
95,018
kWh
$387
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $514 - $464
7,864
kWh
$50
-
kW-mo/yr
03 2.7226: Use computer programs to optimize hvac performance $419 $1,000 $419
7,104
kWh
-
04 2.9114: Use solar heat to make electricty $7,495 $93,870 $7,495
127,041
kWh
-
TOTAL RECOMMENDED $14,322 $117,573 $13,885
237,027
kWh
$437
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs