Assessment Year | 2017 |
---|---|
Principal Product | wine |
NAICS | 312130: Wineries |
SIC | 2084: Wines, Brandy, and Brandy Spirits |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
75,550
ft2
|
Annual Production | 2,700,000
units
|
Production Hrs. Annual | 4,773
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $200,373 | 2,228,250 |
kWh
|
$0.090 | |
Natural Gas | $17,369 | 1,683 |
MMBtu
|
$10.32 | |
Waste Disposal Costs | |||||
Water Usage | $14,501 | 5,830 |
Tgal
|
$2.49 | |
TOTAL YEARLY COSTS | $232,243 | ||||
RECOMMENDED SAVINGS* | $41,135 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $37,779 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,949 | $28,500 |
$6,469
71,881
kWh
|
$480 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,265 | $12,363 |
$2,767
30,738
kWh
|
$498 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,125 | $30 |
$1,125
12,500
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $713 | $250 |
$713
7,925
kWh
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,356 | $8,300 |
$3,356
38,402
kWh
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $1,438 | $11,250 |
$1,438
15,980
kWh
|
- | |
07 | 2.2511: Insulate bare equipment | $20,503 | $34,150 |
$20,503
227,816
kWh
|
- | |
08 | 2.2511: Insulate bare equipment | $3,785 | $21,000 |
$3,785
42,054
kWh
|
- | |
TOTAL RECOMMENDED | $41,135 | $115,843 |
$40,157
447,297
kWh
|
$978 | ||
TOTAL IMPLEMENTED | $37,779 | $107,543 |
$36,801
408,895
kWh
|
$978 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs