Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Steel Joists
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 112,107
ft2
Annual Production 30,000
units
Production Hrs. Annual 4,125
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,629 3,044,400
kWh
Electricity Demand $25,224 9,286
kW-mo/yr
Natural Gas $76,204 11,090
MMBtu
Waste Disposal Costs
Water Usage $2,296 435,369
Tgal
TOTAL YEARLY COSTS $325,353
RECOMMENDED SAVINGS* $36,873 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,666

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $19,149 $22,600 $(-138.9)
(-1,902)
kWh
- $19,288
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $525 $50 $473
6,482
kWh
$52
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $1,852 $1,250 $1,671
22,892
kWh
$181
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,463 $2,250 $2,222
30,443
kWh
$241
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $1,752 $550 - - $1,752
-
MMBtu
06 2.4322: Use or replace with energy efficient substitutes $4,716 $5,600 $4,255
58,288
kWh
$461
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,904 $15,775 $3,405
46,649
kWh
$499
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,021 $4,675 $913
12,512
kWh
$108
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $1,491 $760 $1,491
20,419
kWh
- -
TOTAL RECOMMENDED $36,873 $53,510 $14,291
195,783
kWh
$1,542
-
kW-mo/yr
$21,040
-
MMBtu
TOTAL IMPLEMENTED $30,666 $47,150 $8,545
117,076
kWh
$1,081
-
kW-mo/yr
$21,040
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings