ITAC Assessment: SD0295
ITAC logo
ITAC Assessment: SD0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product pizza
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range n/a
# of Employees 300
Plant Area 70,000
ft2
Annual Production 171,360,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $725,011 7,133,045
kWh
Electricity Demand $187,466 13,766
kW-mo/yr
Electricity Fees $3,588 -
Natural Gas $359,466 59,240
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $664,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $417,930

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2694: Use highest temperature for chilling or cold storage $9,645 $200 $9,645
94,955
kWh
- - -
02 2.3132: Recharge batteries on during off-peak demand periods $3,840 - - $3,840
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $26,967 - $26,462
26,462
kWh
$505
-
kW-mo/yr
- -
04 2.7134: Use photocell controls $1,578 $1,000 $901
8,868
kWh
$677
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,373 $3,000 $1,181
11,625
kWh
$192
-
kW-mo/yr
- -
06 2.7145: Install skylights $543 $1,200 $310
3,052
kWh
$233
-
kW-mo/yr
- -
07 3.5311: Recover and reuse waste material $198,000 $15,000 - - $198,000
-
lb
-
08 4.441: Install automatic packing equipment $416,352 $655,000 - - - $416,352
09 4.441: Install automatic packing equipment $5,965 $3,500 - - - $5,965
TOTAL RECOMMENDED $664,263 $678,900 $38,499
144,962
kWh
$5,447
-
kW-mo/yr
$198,000
-
lb
$422,317
TOTAL IMPLEMENTED $417,930 $656,000 $901
8,868
kWh
$677
-
kW-mo/yr
- $416,352
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs