| Assessment Year | 1994 |
|---|---|
| Principal Product | Animal Feed |
| NAICS |
n/a
|
| SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
| Sales Range | $5 M to 10M |
| # of Employees | 11 |
| Plant Area |
35,000
ft2
|
| Annual Production | 35,000
ton
|
| Production Hrs. Annual | 3,770
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $101,080 | 1,161,782 |
kWh
|
$0.087 |
| Natural Gas | $16,890 | 5,027 |
MMBtu
|
$3.36 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,490 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,170 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $4,440 | $7,280 |
$4,440
50,996
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,190 | $210 |
$2,190
25,205
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,000 | $1,380 |
$1,000
11,430
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $910 | $20 |
$910
10,551
kWh
|
- | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $740 | $800 | - |
$740
-
MMBtu
|
|
| 06 | 2.4221: Install compressor air intakes in coolest locations | $540 | $90 |
$540
6,155
kWh
|
- | |
| 07 | 2.2136: Install / repair insulation on steam lines | $350 | $440 | - |
$350
-
MMBtu
|
|
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $320 | $570 |
$320
3,810
kWh
|
- | |
| TOTAL RECOMMENDED | $10,490 | $10,790 |
$9,400
108,147
kWh
|
$1,090
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $8,170 | $8,960 |
$8,170
93,786
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs