ITAC Assessment: CO0304
ITAC logo
ITAC Assessment: CO0304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Animal Feed
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $5
M
to 10
M
# of Employees 11
Plant Area 35,000
ft2
Annual Production 35,000
ton
Production Hrs. Annual 3,770
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,080 1,161,782
kWh
Natural Gas $16,890 5,027
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,170

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $4,440 $7,280 $4,440
50,996
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,190 $210 $2,190
25,205
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,000 $1,380 $1,000
11,430
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $910 $20 $910
10,551
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $740 $800 - $740
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $540 $90 $540
6,155
kWh
-
07 2.2136: Install / repair insulation on steam lines $350 $440 - $350
-
MMBtu
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $320 $570 $320
3,810
kWh
-
TOTAL RECOMMENDED $10,490 $10,790 $9,400
108,147
kWh
$1,090
-
MMBtu
TOTAL IMPLEMENTED $8,170 $8,960 $8,170
93,786
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs