ITAC Assessment: LS2211
ITAC logo
ITAC Assessment: LS2211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Raw Sugar
NAICS 311314: Cane Sugar Manufacturing
SIC 2061: Cane Sugar, Except Refining
Sales Range less than $500
k
# of Employees 100
Plant Area 100,000
ft2
Annual Production 1,000,000
ton
Production Hrs. Annual 3,640
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $517,644 4,039,488
kWh
Electricity Demand $248,910 39,424
kW-mo/yr
Waste Disposal Costs
Water Usage $31,191 68,642
Tgal
TOTAL YEARLY COSTS $797,745
RECOMMENDED SAVINGS* $18,546 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,831

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7261: Install timers and/or thermostats $1,683 $38 $1,683
13,132
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $572 $25 $572
4,466
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,622 $765 $8,622
67,280
kWh
04 2.7134: Use photocell controls $842 $111 $842
6,570
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,384 $375 $1,384
10,799
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,367 $2,425 $5,367
41,878
kWh
07 2.7135: Install occupancy sensors $76 $50 $76
590
kWh
TOTAL RECOMMENDED $18,546 $3,789 $18,546
144,715
kWh
TOTAL IMPLEMENTED $14,831 $3,301 $14,831
115,728
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs