Assessment Year | 2017 |
---|---|
Principal Product | Rubber and Plastic Sealing and Isolation components |
NAICS | 326291: Rubber Product Manufacturing for Mechanical Use |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 69 |
Plant Area |
165,000
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,265,453 | 16,874,602 |
kWh
|
$0.075 | |
Electricity Demand | $102,195 | 43,064 |
kW-mo/yr
|
$2.37 | |
Natural Gas | $120,461 | 40,973 |
MMBtu
|
$2.94 | |
Waste Disposal Costs | |||||
Water Usage | $75,488 | 6,137,100 |
Tgal
|
$0.012 | |
TOTAL YEARLY COSTS | $1,563,597 | ||||
RECOMMENDED SAVINGS* | $56,443 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $35,958 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $2,119 | $1,550 |
$2,119
26,568
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,578 | $60,055 |
$14,652
195,360
kWh
|
$926
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $403 | $1,482 |
$345
4,603
kWh
|
$58
-
kW-mo/yr
|
- | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $472 | $2,100 | - | - |
$472
-
MMBtu
|
|
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $10,034 | $12,800 |
$3,143
41,904
kWh
|
- |
$6,891
-
MMBtu
|
|
06 | 2.2136: Install / repair insulation on steam lines | $3,504 | $420 | - | - |
$3,504
-
MMBtu
|
|
07 | 2.4225: Install common header on compressors | $20,012 | $10,400 |
$20,012
266,823
kWh
|
- | - | |
08 | 2.7291: Reschedule and rearrange multiple-source heating systems | $4,320 | $4,328 |
$4,320
57,600
kWh
|
- | - | |
TOTAL RECOMMENDED | $56,443 | $93,135 |
$44,591
592,858
kWh
|
$984
-
kW-mo/yr
|
$10,868
-
MMBtu
|
||
TOTAL IMPLEMENTED | $35,958 | $80,635 |
$24,579
326,035
kWh
|
$984
-
kW-mo/yr
|
$10,395
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs