ITAC Assessment: MZ0219
ITAC logo
ITAC Assessment: MZ0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Rubber and Plastic Sealing and Isolation components
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 69
Plant Area 165,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,265,453 16,874,602
kWh
Electricity Demand $102,195 43,064
kW-mo/yr
Natural Gas $120,461 40,973
MMBtu
Waste Disposal Costs
Water Usage $75,488 6,137,100
Tgal
TOTAL YEARLY COSTS $1,563,597
RECOMMENDED SAVINGS* $56,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,958

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $2,119 $1,550 $2,119
26,568
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,578 $60,055 $14,652
195,360
kWh
$926
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $403 $1,482 $345
4,603
kWh
$58
-
kW-mo/yr
-
04 2.2414: Use waste heat from hot flue gases to preheat $472 $2,100 - - $472
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $10,034 $12,800 $3,143
41,904
kWh
- $6,891
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $3,504 $420 - - $3,504
-
MMBtu
07 2.4225: Install common header on compressors $20,012 $10,400 $20,012
266,823
kWh
- -
08 2.7291: Reschedule and rearrange multiple-source heating systems $4,320 $4,328 $4,320
57,600
kWh
- -
TOTAL RECOMMENDED $56,443 $93,135 $44,591
592,858
kWh
$984
-
kW-mo/yr
$10,868
-
MMBtu
TOTAL IMPLEMENTED $35,958 $80,635 $24,579
326,035
kWh
$984
-
kW-mo/yr
$10,395
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs