ITAC Assessment: MZ0182
ITAC logo
ITAC Assessment: MZ0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Processed Bacon and Ham
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 180,000
ft2
Annual Production 41,800
ton
Production Hrs. Annual 8,736
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $614,339 8,390,975
kWh
Electricity Demand $35,584 15,133
kW-mo/yr
Natural Gas $332,286 75,870
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4322: Use or replace with energy efficient substitutes $2,344 $5,600 $2,344
33,482
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $9,859 $1,100 $9,273
132,469
kWh
$586
-
kW-mo/yr
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,623 - $5,623
80,330
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,921 $15,600 $12,351
176,441
kWh
$570
-
kW-mo/yr
05 2.7135: Install occupancy sensors $1,985 $1,740 $1,985
28,361
kWh
-
06 2.6231: Utilize controls to operate equipment only when needed $37,902 $42,400 $37,902
541,462
kWh
-
TOTAL RECOMMENDED $70,634 $66,440 $69,478
992,545
kWh
$1,156
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs