ITAC Assessment: AS0415
ITAC logo
ITAC Assessment: AS0415
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Pyrotechnique devices
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 3489: Ordnance and Accessories, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 235
Plant Area 100,000
ft2
Annual Production 10
units
Production Hrs. Annual 3,120
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,702 3,814,704
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,111

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Increase in Production Savings
01 4.131: Modify process to reduce material use/cost $19,739 $5,500 - $8,509 $11,230
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,463 $24,000 $2,463
90,540
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,372 $1,000 $2,372
87,232
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $928 $3,000 $928
34,073
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $810 $12,174 $810
5,104
kWh
- -
06 2.9112: Use solar heat to heat water $132 $2,800 $132
4,801
kWh
- -
TOTAL RECOMMENDED $26,444 $48,474 $6,705
221,750
kWh
$8,509 $11,230
TOTAL IMPLEMENTED $22,111 $6,500 $2,372
87,232
kWh
$8,509 $11,230
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs