ITAC Assessment: MZ0072
ITAC logo
ITAC Assessment: MZ0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product printed labels
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area 65,000
ft2
Annual Production 250
ton
Production Hrs. Annual 6,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,248,421 23,742,566
kWh
Natural Gas $18,350 1,711
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $172,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $168,536

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,745 $19,300 $19,745
208,500
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $44,200 $56,140 $44,200
466,740
kWh
-
03 2.7135: Install occupancy sensors $2,639 $180 $2,639
27,864
kWh
-
04 2.7135: Install occupancy sensors $2,260 $400 $2,260
23,050
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $1,345 - $1,345
14,208
kWh
-
06 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $8,585 $4,500 $8,585
90,654
kWh
-
07 2.7262: Separate controls of air handlers from ac/ heating systems $36,070 $1,160 $36,070
370,343
kWh
-
08 2.6212: Turn off equipment during breaks, reduce operating time $2,583 - $2,583
26,524
kWh
-
09 2.4221: Install compressor air intakes in coolest locations $4,875 $1,120 $4,875
50,052
kWh
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $438 - $438
4,625
kWh
-
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,058 - $13,633
143,505
kWh
$1,425
-
kW-mo/yr
12 2.7221: Lower temperature during the winter season and vice-versa $22,620 - $22,620
238,858
kWh
-
13 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,046 - $10,906
115,407
kWh
$1,140
-
kW-mo/yr
TOTAL RECOMMENDED $172,464 $82,800 $169,899
1,780,330
kWh
$2,565
-
kW-mo/yr
TOTAL IMPLEMENTED $168,536 $82,800 $165,971
1,739,598
kWh
$2,565
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs