ITAC Assessment: MZ0053
ITAC logo
ITAC Assessment: MZ0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product bottled soft drink
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 36
Plant Area 243,000
ft2
Annual Production 180
Tgal
Production Hrs. Annual 7,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,762 5,980,800
kWh
Electricity Demand $70,772 14,327
kW-mo/yr
Natural Gas $143,896 29,729
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $105,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1224: Replace boiler $33,880 $115,000 - - $33,880
-
MMBtu
02 2.7492: Use proper thickness of insulation on building envelope $959 $1,000 - - $959
-
MMBtu
03 2.2437: Recover waste heat from equipment $22,455 $10,000 - - $22,455
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $18,022 $33,660 $14,877
362,866
kWh
$3,145
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $888 $1,550 $888
21,672
kWh
- -
06 2.6218: Turn off equipment when not in use $987 - $987
24,080
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $3,342 $1,160 $2,770
67,568
kWh
$572
-
kW-mo/yr
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,601 - $4,601
112,227
kWh
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $2,207 - $2,207
53,837
kWh
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,916 $1,100 $2,916
71,132
kWh
- -
11 2.6231: Utilize controls to operate equipment only when needed $14,987 $5,000 $14,987
365,540
kWh
- -
TOTAL RECOMMENDED $105,244 $168,470 $44,233
1,078,922
kWh
$3,717
-
kW-mo/yr
$57,294
-
MMBtu
TOTAL IMPLEMENTED $105,244 $168,470 $44,233
1,078,922
kWh
$3,717
-
kW-mo/yr
$57,294
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs