ITAC Assessment: MZ0008
ITAC logo
ITAC Assessment: MZ0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product centrifuges
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 36
Plant Area 120,000
ft2
Annual Production 95
pieces
Production Hrs. Annual 1,992
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,087 484,898
kWh
Natural Gas $58,090 4,293
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,445 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,445

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,856 $21,050 $14,856
183,516
kWh
-
02 2.1221: Replace obsolete burners with more efficient ones $44,772 $6,399 - $44,772
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,289 $800 $1,289
18,949
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $694 $1,300 $694
9,252
kWh
-
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $812 - $812
11,952
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $22 $23 $22
333
kWh
-
TOTAL RECOMMENDED $62,445 $29,572 $17,673
224,002
kWh
$44,772
-
MMBtu
TOTAL IMPLEMENTED $62,445 $29,572 $17,673
224,002
kWh
$44,772
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs