ITAC Assessment: MZ0350
ITAC logo
ITAC Assessment: MZ0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product plastic sheet and roll stock
NAICS 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 49
Plant Area 131,000
ft2
Annual Production 16,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $702,636 8,074,706
kWh
Natural Gas $35,584 2,478
MMBtu
Waste Disposal Costs
Water Usage $11,448 2,698
Tgal
Water Disposal $6,371 1,469
Tgal
TOTAL YEARLY COSTS $756,039
RECOMMENDED SAVINGS* $86,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,517

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,815 $440 $4,815
55,352
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,082 $600 $3,082
31,885
kWh
-
03 2.3191: Use demand controller or load shedder $8,826 $2,520 - $8,826
04 2.7135: Install occupancy sensors $9,435 $9,200 $9,435
111,005
kWh
-
05 2.9114: Use solar heat to make electricty $60,709 $140,732 $60,709
697,812
kWh
-
TOTAL RECOMMENDED $86,867 $153,492 $78,041
896,054
kWh
$8,826
TOTAL IMPLEMENTED $12,517 $9,800 $12,517
142,890
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs