ITAC Assessment: MS0210
ITAC logo
ITAC Assessment: MS0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Comerical furniture
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 77
Plant Area 141,000
ft2
Annual Production 164,250
pieces
Production Hrs. Annual 4,212
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,669 3,661,600
kWh
Electricity Demand $163,319 17,046
kW-mo/yr
Electricity Fees $4,600 -
Natural Gas $53,463 7,675
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,749 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,614

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $24,185 $100 - $23,822
-
kW-mo/yr
$363 -
02 2.2437: Recover waste heat from equipment $3,534 $2,331 - - - $3,534
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,968 $405 $1,939
57,702
kWh
- $29 -
04 2.7122: Disconnect ballasts $461 $495 $161
4,789
kWh
$293
-
kW-mo/yr
$7 -
05 2.4221: Install compressor air intakes in coolest locations $346 $274 $121
3,592
kWh
$220
-
kW-mo/yr
$5 -
06 2.7261: Install timers and/or thermostats $255 $119 $252
7,486
kWh
- $3 -
TOTAL RECOMMENDED $30,749 $3,724 $2,473
73,569
kWh
$24,335
-
kW-mo/yr
$407 $3,534
-
MMBtu
TOTAL IMPLEMENTED $26,614 $1,000 $2,100
62,491
kWh
$24,115
-
kW-mo/yr
$399 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs