| Assessment Year | 2025 |
|---|---|
| Principal Product | HVAC Equipment |
| NAICS | 238220: Plumbing, Heating, and Air-Conditioning Contractors |
| SIC | 1711: Plumbing, Heating and Air-Conditioning |
| Sales Range | $10 M to 50M |
| # of Employees | 175 |
| Plant Area |
30,000
ft2
|
| Annual Production | 3,700
units
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $31,238 | 220,588 |
kWh
|
$0.14 |
| Electricity Fees | $7,225 | - |
|
- |
| Natural Gas | $15,224 | 1,491 |
MMBtu
|
$10.21 |
| Other Gas | $1,353 | 1 |
MMBtu
|
$1,353.00 |
| TOTAL YEARLY COSTS | $55,040 | |||
| RECOMMENDED SAVINGS* | $11,738 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,696 | $11,326 |
$(-150.0)
(-1,053)
kWh
|
$6,846
-
MMBtu
|
|
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $2,532 | - |
$1,536
10,818
kWh
|
$996
-
MMBtu
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $206 | - |
$206
1,466
kWh
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $930 | - |
$930
6,552
kWh
|
- | |
| 05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $720 | - |
$720
5,070
kWh
|
- | |
| 06 | 2.7135: Install occupancy sensors | $100 | $438 |
$100
702
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $123 | $468 |
$123
867
kWh
|
- | |
| 08 | 2.7261: Install timers and/or thermostats | $306 | $217 | - |
$306
-
MMBtu
|
|
| 09 | 2.7492: Use proper thickness of insulation on building envelope | $125 | $215 |
$48
341
kWh
|
$76
-
MMBtu
|
|
| TOTAL RECOMMENDED | $11,738 | $12,664 |
$3,514
24,762
kWh
|
$8,224
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs