ITAC Assessment: MU0061
ITAC logo
ITAC Assessment: MU0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Landing gear sets for commercial truck trailers
NAICS 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 275
Plant Area 65,000
ft2
Annual Production 520,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,363 2,223,043
kWh
Electricity Demand $98,847 5,370
kW-mo/yr
Electricity Fees $5,409 -
Natural Gas $108,093 20,621
MMBtu
Other Gas $4,896 1
MMBtu
Waste Disposal Costs
Water Usage $9,416 2,260
Tgal
Water Disposal $15,267 2,260
Tgal
Other Liquid (non-haz) $762 1
gal
TOTAL YEARLY COSTS $386,053
RECOMMENDED SAVINGS* $36,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $3,468 $4,140 - $1,871
-
kW-mo/yr
- - $1,597
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,426 $12,734 $1,222
20,369
kWh
$721
-
kW-mo/yr
$1,482
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,134 - $73
1,217
kWh
$43
-
kW-mo/yr
- $1,018 -
04 2.6232: Install set-back timers $24,478 $160,704 $7,579
126,309
kWh
$5,536
-
kW-mo/yr
$11,364
-
MMBtu
- -
05 2.7135: Install occupancy sensors $246 $339 $69
1,150
kWh
$177
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $89 $114 $39
652
kWh
$50
-
kW-mo/yr
- - -
07 2.7231: Use radiant heater for spot heating $2,592 $10,260 - - $2,592
-
MMBtu
- -
08 2.7261: Install timers and/or thermostats $393 $580 $84
1,397
kWh
$309
-
kW-mo/yr
- - -
09 2.7496: Install partitions to reduce size of conditioned space $370 $1,608 - - $370
-
MMBtu
- -
TOTAL RECOMMENDED $36,195 $190,479 $9,066
151,094
kWh
$8,707
-
kW-mo/yr
$15,808
-
MMBtu
$1,018 $1,597
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs