| Assessment Year | 2025 |
|---|---|
| Principal Product | Landing gear sets for commercial truck trailers |
| NAICS | 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $100 M to 500M |
| # of Employees | 275 |
| Plant Area |
65,000
ft2
|
| Annual Production | 520,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $143,363 | 2,223,043 |
kWh
|
$0.064 | |
| Electricity Demand | $98,847 | 5,370 |
kW-mo/yr
|
$18.41 | |
| Electricity Fees | $5,409 | - |
|
- | |
| Natural Gas | $108,093 | 20,621 |
MMBtu
|
$5.24 | |
| Other Gas | $4,896 | 1 |
MMBtu
|
$4,896.23 | |
| Waste Disposal Costs | |||||
| Water Usage | $9,416 | 2,260 |
Tgal
|
$4.17 | |
| Water Disposal | $15,267 | 2,260 |
Tgal
|
$6.76 | |
| Other Liquid (non-haz) | $762 | 1 |
gal
|
$762.00 | |
| TOTAL YEARLY COSTS | $386,053 | ||||
| RECOMMENDED SAVINGS* | $36,195 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $29,127 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3132: Recharge batteries on during off-peak demand periods | $3,468 | $4,140 | - |
$1,871
-
kW-mo/yr
|
- | - | $1,597 | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,426 | $12,734 |
$1,222
20,369
kWh
|
$721
-
kW-mo/yr
|
$1,482
-
MMBtu
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,134 | - |
$73
1,217
kWh
|
$43
-
kW-mo/yr
|
- | $1,018 | - | |
| 04 | 2.6232: Install set-back timers | $24,478 | $160,704 |
$7,579
126,309
kWh
|
$5,536
-
kW-mo/yr
|
$11,364
-
MMBtu
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $246 | $339 |
$69
1,150
kWh
|
$177
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $89 | $114 |
$39
652
kWh
|
$50
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.7231: Use radiant heater for spot heating | $2,592 | $10,260 | - | - |
$2,592
-
MMBtu
|
- | - | |
| 08 | 2.7261: Install timers and/or thermostats | $393 | $580 |
$84
1,397
kWh
|
$309
-
kW-mo/yr
|
- | - | - | |
| 09 | 2.7496: Install partitions to reduce size of conditioned space | $370 | $1,608 | - | - |
$370
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $36,195 | $190,479 |
$9,066
151,094
kWh
|
$8,707
-
kW-mo/yr
|
$15,808
-
MMBtu
|
$1,018 | $1,597 | ||
| TOTAL IMPLEMENTED | $29,127 | $173,552 |
$8,913
148,547
kWh
|
$6,350
-
kW-mo/yr
|
$12,846
-
MMBtu
|
$1,018 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs