Assessment Year | 1993 |
---|---|
Principal Product | Graphite Electrodes |
NAICS |
n/a
|
SIC | 3624: Carbon and Graphite Products |
Sales Range | $5 M to 10M |
# of Employees | 94 |
Plant Area |
108,717
ft2
|
Annual Production | 4,500
ton
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,055,064 | 20,121,044 |
kWh
|
$0.052 |
Natural Gas | $461,974 | 187,519 |
MMBtu
|
$2.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,837 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,098 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $2,244 | $230 |
$2,244
42,790
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,622 | $620 |
$7,622
145,369
kWh
|
- | |
03 | 2.4131: Size electric motors for peak operating efficiency | $1,739 | $600 |
$1,739
33,118
kWh
|
- | |
04 | 2.2135: Repair and eliminate steam leaks | $1,845 | $475 | - |
$1,845
-
MMBtu
|
|
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $387 | $1,000 | - |
$387
-
MMBtu
|
|
TOTAL RECOMMENDED | $13,837 | $2,925 |
$11,605
221,277
kWh
|
$2,232
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,098 | $2,325 |
$9,866
188,159
kWh
|
$2,232
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs