Assessment Year | 2011 |
---|---|
Principal Product | Air Conditioning Equipment |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
82,000
ft2
|
Annual Production | 1,000
units
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $161,629 | 2,107,143 |
kWh
|
$0.077 |
Electricity Demand | $5,195 | 5,172 |
kW-mo/yr
|
$1.00 |
Electricity Fees | $21,793 | - |
|
- |
Natural Gas | $18,350 | 2,426 |
MMBtu
|
$7.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,059 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,427 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,400 | $293 |
$1,380
17,736
kWh
|
- | $20 | - | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $31,659 | $34,108 |
$21,311
277,812
kWh
|
- | $320 |
$10,028
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $264 | $317 |
$249
3,244
kWh
|
$11
-
kW-mo/yr
|
$4 | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $14,709 | $57,080 |
$14,062
183,306
kWh
|
$430
-
kW-mo/yr
|
$217 | - | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $2,990 | $12,600 |
$2,946
38,397
kWh
|
- | $44 | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,037 | $8,580 |
$2,007
26,158
kWh
|
- | $30 | - | |
TOTAL RECOMMENDED | $53,059 | $112,978 |
$41,955
546,653
kWh
|
$441
-
kW-mo/yr
|
$635 |
$10,028
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,427 | $21,473 |
$6,333
82,291
kWh
|
- | $94 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs