ITAC Assessment: TN0465
ITAC logo
ITAC Assessment: TN0465
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product LAMINATED PLASTIC FURN.
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 8,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,669 200,469
kWh
Natural Gas $8,410 1,252
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,351 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7123: Keep lamps and reflectors clean $2,859 $8,652 $2,710
39,859
kWh
$149
02 2.7221: Lower temperature during the winter season and vice-versa $817 - $817
18,171
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $259 $85 $259
3,810
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $219 $350 $219
3,224
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $140 - $140
2,052
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $57 $114 $291
4,396
kWh
$(-234.0)
TOTAL RECOMMENDED $4,351 $9,201 $4,436
71,512
kWh
$(-85.0)
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs