ITAC Assessment: MS0270
ITAC logo
ITAC Assessment: MS0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product PVC Pipe Fittings
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 459
Plant Area 480,344
ft2
Annual Production 47,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $846,747 32,854,800
kWh
Electricity Demand $530,288 52,976
kW-mo/yr
Electricity Fees $42,064 -
Natural Gas $137,749 22,166
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $315,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $250,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Product Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $207,595 $1,008,706 $110,683
5,250,637
kWh
$93,844
-
kW-mo/yr
$3,068 -
02 2.4156: Establish a preventative maintenance program $62,790 $34,773 - - - $62,790
03 2.7142: Utilize higher efficiency lamps and/or ballasts $36,478 $89,204 $21,414
1,015,858
kWh
$14,525
-
kW-mo/yr
$539 -
04 2.4239: Eliminate or reduce compressed air usage $4,299 - $4,235
200,909
kWh
- $64 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,451 $228 $1,429
67,807
kWh
- $22 -
06 2.4221: Install compressor air intakes in coolest locations $1,035 - $379
18,002
kWh
$641
-
kW-mo/yr
$15 -
07 2.7221: Lower temperature during the winter season and vice-versa $877 - $864
41,005
kWh
- $13 -
08 2.4133: Use most efficient type of electric motors $635 $1,300 $265
12,577
kWh
$360
-
kW-mo/yr
$10 -
TOTAL RECOMMENDED $315,160 $1,134,211 $139,269
6,606,795
kWh
$109,370
-
kW-mo/yr
$3,731 $62,790
TOTAL IMPLEMENTED $250,700 $1,098,138 $138,625
6,576,216
kWh
$108,369
-
kW-mo/yr
$3,706 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs