Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Catfish
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $50
M
to 100
M
# of Employees 715
Plant Area 154,510
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $764,508 15,953,352
kWh
Electricity Demand $195,280 41,143
kW-mo/yr
Electricity Fees $122,613 -
Natural Gas $12,409 1,538
MMBtu
LPG $7,183 631
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,040 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,284

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings
01 2.7124: Make a practice of turning off lights when not needed $29,186 $4,860 $23,744
526,254
kWh
- $5,442 -
02 2.7229: Air condition only space necessary $10,266 $1,600 $5,552
134,784
kWh
$2,208
-
kW-mo/yr
$2,506 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,360 $25,987 $6,138
133,880
kWh
$819
-
kW-mo/yr
$1,403 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,631 $10,887 $5,518
123,573
kWh
$698
-
kW-mo/yr
$1,415 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,754 $1,328 $979
23,108
kWh
$412
-
kW-mo/yr
$363 -
06 2.3132: Recharge batteries on during off-peak demand periods $1,216 - - $1,003
-
kW-mo/yr
$213 -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,054 $158 $795
19,306
kWh
- $259 -
08 2.7261: Install timers and/or thermostats $868 $1,063 $655
15,903
kWh
- $213 -
09 2.8114: Change rate schedules or other changes in utility service $529 $75 - - - $529
-
MMBtu
10 2.4221: Install compressor air intakes in coolest locations $176 $407 $89
2,160
kWh
$48
-
kW-mo/yr
$39 -
TOTAL RECOMMENDED $61,040 $46,365 $43,470
978,968
kWh
$5,188
-
kW-mo/yr
$11,853 $529
-
MMBtu
TOTAL IMPLEMENTED $31,284 $6,488 $25,283
563,623
kWh
$48
-
kW-mo/yr
$5,953 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs