ITAC Assessment: MS0223
ITAC logo
ITAC Assessment: MS0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Wooden furniture parts
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 275,000
ft2
Annual Production 242,601
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,397 4,070,000
kWh
Electricity Demand $156,206 16,513
kW-mo/yr
Electricity Fees $(-8,890.0) -
Natural Gas $129,671 25,071
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,535 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,007

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3134: Shift from daytime to nighttime operation $33,740 - - $33,241
-
kW-mo/yr
$499 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,538 $8,188 $3,888
117,454
kWh
$7,480
-
kW-mo/yr
$170 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,532 $411 $3,480
105,156
kWh
- $52 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,878 $4,320 $968
29,251
kWh
$1,867
-
kW-mo/yr
$43 -
05 2.4239: Eliminate or reduce compressed air usage $2,829 $3,710 $2,787
84,207
kWh
- $42 -
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,537 $1,000 - - - $1,537
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $1,081 $355 $333
10,071
kWh
$732
-
kW-mo/yr
$16 -
08 2.7261: Install timers and/or thermostats $400 $355 $394
11,903
kWh
- $6 -
TOTAL RECOMMENDED $57,535 $18,339 $11,850
358,042
kWh
$43,320
-
kW-mo/yr
$828 $1,537
-
MMBtu
TOTAL IMPLEMENTED $17,007 $9,954 $7,762
234,513
kWh
$7,480
-
kW-mo/yr
$228 $1,537
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs