ITAC Assessment: MS0207
ITAC logo
ITAC Assessment: MS0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Hydraulic cylinders
NAICS
n/a
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $10
M
to 50
M
# of Employees 88
Plant Area 94,000
ft2
Annual Production 77,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,225 2,280,400
kWh
Electricity Demand $35,878 6,644
kW-mo/yr
Electricity Fees $16,439 -
Natural Gas $12,314 1,282
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,888

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7261: Install timers and/or thermostats $2,269 $291 $1,927
50,371
kWh
- $342 - - - -
02 2.8114: Change rate schedules or other changes in utility service $1,575 $200 - - - - - $1,575 -
03 2.1233: Analyze flue gas for proper air/fuel ratio $990 $1,000 - - - $990
-
MMBtu
- - -
04 2.2437: Recover waste heat from equipment $983 $786 $502
13,125
kWh
$481
-
kW-mo/yr
- - - - -
05 2.7261: Install timers and/or thermostats $491 $437 $417
10,892
kWh
- $74 - - - -
06 2.4221: Install compressor air intakes in coolest locations $270 $44 $169
4,423
kWh
$70
-
kW-mo/yr
$31 - - - -
07 3.1193: Convert from batch operation to continuous processing $4,671 $162 - - - - $19
-
lb
- $4,652
08 3.6124: Burn waste oil for heat $4,037 $3,654 $3,496
78,781
kWh
$481
-
kW-mo/yr
$60 - - - -
09 3.5316: Contract a wood pallet recycling company $1,053 - - - - - $1,053
-
lb
- -
TOTAL RECOMMENDED $16,339 $6,574 $6,511
157,592
kWh
$1,032
-
kW-mo/yr
$507 $990
-
MMBtu
$1,072
-
lb
$1,575 $4,652
TOTAL IMPLEMENTED $3,888 $1,244 $169
4,423
kWh
$70
-
kW-mo/yr
$31 $990
-
MMBtu
$1,053
-
lb
$1,575 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs