ITAC Assessment: MS0197
ITAC logo
ITAC Assessment: MS0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Canned vegetables
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 163
Plant Area 340,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $248,813 5,394,197
kWh
Electricity Demand $40,484 12,934
kW-mo/yr
Electricity Fees $36,763 -
Natural Gas $641,528 109,023
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $35,816 $29,006 $22,858
665,300
kWh
$3,436
-
kW-mo/yr
$9,522 -
02 2.2414: Use waste heat from hot flue gases to preheat $22,484 $19,000 - - - $22,484
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $1,855 $269 - - - $1,855
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $1,389 $2,038 $891
26,084
kWh
$127
-
kW-mo/yr
$371 -
05 2.7261: Install timers and/or thermostats $1,007 $591 $712
20,809
kWh
- $295 -
06 2.7122: Disconnect ballasts $285 $340 $256
5,275
kWh
$25
-
kW-mo/yr
$4 -
07 2.6214: Shut off pilots in standby equipment $264 $122 - - - $264
-
MMBtu
TOTAL RECOMMENDED $63,100 $51,366 $24,717
717,468
kWh
$3,588
-
kW-mo/yr
$10,192 $24,603
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs