ITAC Assessment: MS0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Fluid milk and ice cream
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 46,720
ft2
Annual Production 12,295
Tgal
Production Hrs. Annual 7,488
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,427 3,934,160
kWh
Electricity Fees $3,366 -
Natural Gas $118,442 14,085
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,808 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,134

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.8114: Change rate schedules or other changes in utility service $13,374 $200 - - $13,374
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $660 $1,415 $650
11,314
kWh
$10 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $206 $94 $203
3,529
kWh
$3 - -
04 2.7261: Install timers and/or thermostats $228 $119 $225
3,907
kWh
$3 - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $323 $348 $318
5,529
kWh
$5 - -
06 2.2414: Use waste heat from hot flue gases to preheat $4,675 $8,910 - - $4,675
-
MMBtu
-
07 2.2447: Heat water with exhaust heat $12,268 $10,846 - - $12,268
-
MMBtu
-
08 4.812: Apply for investment incentives $74 $100 - - - $74
-
Tgal
TOTAL RECOMMENDED $31,808 $22,032 $1,396
24,279
kWh
$21 $30,317
-
MMBtu
$74
-
Tgal
TOTAL IMPLEMENTED $13,134 $12,355 $853
14,843
kWh
$13 $12,268
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs