ITAC Assessment: MS0178
ITAC logo
ITAC Assessment: MS0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Injection Molded Parts
NAICS
n/a
SIC 3639: Household Appliances, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 865
Plant Area 900,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $353,842 36,686,645
kWh
Electricity Demand $484,810 96,962
kW-mo/yr
Electricity Fees $969,450 -
Natural Gas $18,023 4,868
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $877,999 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $128,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Primary Product Savings
01 2.7229: Air condition only space necessary $133,472 $38,250 $21,133
4,449,710
kWh
$112,339 -
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $23,451 $3,230 $3,713
781,702
kWh
$19,738 -
03 2.2511: Insulate bare equipment $8,374 $3,053 $1,326
279,142
kWh
$7,048 -
04 2.6231: Utilize controls to operate equipment only when needed $5,493 $1,893 $870
183,096
kWh
$4,623 -
05 2.4221: Install compressor air intakes in coolest locations $964 $1,459 $153
32,118
kWh
$811 -
06 4.511: Expand operations into unused space $583,296 $1,050,000 - $583,296 -
07 4.445: Install equipment to move product $122,949 $105,000 - - $122,949
TOTAL RECOMMENDED $877,999 $1,202,885 $27,195
5,725,768
kWh
$727,855 $122,949
TOTAL IMPLEMENTED $128,442 $106,893 $870
183,096
kWh
$4,623 $122,949
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs