ITAC Assessment: UF0142
ITAC logo
ITAC Assessment: UF0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Submarine Detectors
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 170,000
ft2
Annual Production 85,000
pieces
Production Hrs. Annual 2,730
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,425 4,418,523
kWh
Electricity Demand $104,030 14,678
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,404

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,261 $13,535 $4,973
93,787
kWh
$2,288
-
kW-mo/yr
02 2.7111: Reduce illumination to minimum necessary levels $28,518 - $20,312
383,353
kWh
$8,206
-
kW-mo/yr
03 2.7232: Replace existing hvac unit with high efficiency model $72,393 $42,350 $55,014
1,038,101
kWh
$17,379
-
kW-mo/yr
04 2.7272: Install heat pipes / raise cooling setpoint $4,570 $7,000 $4,570
86,166
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,011 $500 $1,011
13,189
kWh
-
TOTAL RECOMMENDED $113,753 $63,385 $85,880
1,614,596
kWh
$27,873
-
kW-mo/yr
TOTAL IMPLEMENTED $73,404 $42,850 $56,025
1,051,290
kWh
$17,379
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs