ITAC Assessment: MS0173
ITAC logo
ITAC Assessment: MS0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Parts cleaning and stripping
NAICS
n/a
SIC 2841: Soap and Other Detergents, Except Specialty Cleaners
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 58,000
ft2
Annual Production 5,907,069
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,634 522,274
kWh
Electricity Demand $5,720 1,692
kW-mo/yr
Electricity Fees $2,498 -
Natural Gas $58,164 9,422
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,405

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $2,872 $1,710 - - - $2,872
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,747 $191 $2,561
77,374
kWh
- $186 - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $635 $2,618 $238
7,034
kWh
$354
-
kW-mo/yr
$43 - - -
04 2.7134: Use photocell controls $240 $222 $224
6,741
kWh
- $16 - - -
05 2.7261: Install timers and/or thermostats $238 $236 $222
3,517
kWh
- $16 - - -
06 2.4221: Install compressor air intakes in coolest locations $206 $65 $103
3,224
kWh
$89
-
kW-mo/yr
$14 - - -
07 2.2511: Insulate bare equipment $169 $381 - - - $169
-
MMBtu
- -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $831 $599 $506
15,240
kWh
$629
-
kW-mo/yr
$82 $(-386.0)
-
MMBtu
- -
09 2.8121: Apply for tax-free status for energy purchases $5,488 $50 - - $1,372 - - $4,116
10 2.8121: Apply for tax-free status for energy purchases $11,932 $50 - - - $2,983
-
MMBtu
- $8,949
11 4.821: Pay bills on time to avoid late fees $1,514 $50 - - - - $1,514
-
Tgal
-
TOTAL RECOMMENDED $26,872 $6,172 $3,854
113,130
kWh
$1,072
-
kW-mo/yr
$1,729 $5,638
-
MMBtu
$1,514
-
Tgal
$13,065
TOTAL IMPLEMENTED $20,405 $527 $2,783
80,891
kWh
- $1,574 $2,983
-
MMBtu
- $13,065
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings