ITAC Assessment: MS0172
ITAC logo
ITAC Assessment: MS0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Sinuous Springs
NAICS
n/a
SIC 3495: Wire Springs
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area 140,000
ft2
Annual Production 125,000,000
pieces
Production Hrs. Annual 4,200
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,962 1,072,180
kWh
Electricity Demand $17,069 3,669
kW-mo/yr
Electricity Fees $2,535 -
LPG $83,460 10,445
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,286

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.2442: Preheat combustion air with waste heat $3,027 $1,383 - - - $3,027
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,307 $309 $1,288
36,300
kWh
- $19 - - -
03 2.7261: Install timers and/or thermostats $624 $708 $615
17,340
kWh
- $9 - - -
04 2.6214: Shut off pilots in standby equipment $346 $40 - - - $346
-
MMBtu
- -
05 2.7124: Make a practice of turning off lights when not needed $951 $100 $324
9,120
kWh
$613
-
kW-mo/yr
$14 - - -
06 2.4221: Install compressor air intakes in coolest locations $66 $151 $25
705
kWh
$40
-
kW-mo/yr
$1 - - -
07 4.652: Replace existing equipment with more suitable substitutes $9,009 $7,649 $199
5,621
kWh
$(-160.0)
-
kW-mo/yr
- - $2,970 $6,000
TOTAL RECOMMENDED $15,330 $10,340 $2,451
69,086
kWh
$493
-
kW-mo/yr
$43 $3,373
-
MMBtu
$2,970 $6,000
TOTAL IMPLEMENTED $11,286 $8,706 $2,102
59,261
kWh
$(-160.0)
-
kW-mo/yr
$28 $346
-
MMBtu
$2,970 $6,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs