ITAC Assessment: MS0171
ITAC logo
ITAC Assessment: MS0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Office Furniture
NAICS
n/a
SIC 2522: Office Furniture, Except Wood
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 250,000
ft2
Annual Production 430,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,382 3,065,944
kWh
Electricity Demand $52,369 12,393
kW-mo/yr
Electricity Fees $58,398 -
Natural Gas $118,529 17,903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,755 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2511: Insulate bare equipment $162 $364 n/a - - - $162
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,812 $1,207 n/a $4,564
73,564
kWh
$3,413
-
kW-mo/yr
$144 $(-2,309.0)
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $1,243 $827 n/a $1,221
19,637
kWh
- $22 - -
04 2.4221: Install compressor air intakes in coolest locations $1,198 $228 n/a $893
14,361
kWh
$284
-
kW-mo/yr
$21 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,474 $697 n/a $4,395
70,926
kWh
- $79 - -
06 4.424: Improve space comfort conditioning $64,866 $23,339 n/a $(-2,691.0)
(-58,617)
kWh
$(-1,422.0)
-
kW-mo/yr
$(-1,021.0) - $70,000
TOTAL RECOMMENDED $77,755 $26,662 $8,382
119,871
kWh
$2,275
-
kW-mo/yr
$(-755.0) $(-2,147.0)
-
MMBtu
$70,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs