ITAC Assessment: MS0164
ITAC logo
ITAC Assessment: MS0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Wooden and Metal Outdoor Furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 141
Plant Area 383,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 2,900
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,731 3,798,652
kWh
Electricity Demand $35,118 13,306
kW-mo/yr
Electricity Fees $(-6,395.0) -
Natural Gas $144,068 42,956
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,628

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,436 $604 $3,554
74,443
kWh
- $882 -
02 2.4221: Install compressor air intakes in coolest locations $332 $124 $216
4,396
kWh
$47
-
kW-mo/yr
$69 -
03 2.7261: Install timers and/or thermostats $1,352 $355 $1,083
22,567
kWh
- $269 -
04 2.7122: Disconnect ballasts $1,506 $876 $981
20,516
kWh
$213
-
kW-mo/yr
$312 -
05 2.4314: Use synthetic lubricant $1,686 $1,686 $981
20,516
kWh
$213
-
kW-mo/yr
$313 $179
06 2.2511: Insulate bare equipment $259 $196 $207
4,396
kWh
- $52 -
TOTAL RECOMMENDED $9,571 $3,841 $7,022
146,834
kWh
$473
-
kW-mo/yr
$1,897 $179
TOTAL IMPLEMENTED $7,628 $3,166 $5,516
115,475
kWh
$426
-
kW-mo/yr
$1,507 $179
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs