ITAC Assessment: OR0574
ITAC logo
ITAC Assessment: OR0574
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Millwork
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 335,000
ft2
Annual Production 24,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $478,705 10,321,625
kWh
Electricity Demand $111,593 20,976
kW-mo/yr
Natural Gas $44,613 8,825
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $306,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,450

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $35,460 $21,200 $25,110
519,920
kWh
- $2,480 $7,870
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,450 $7,166 $6,450
148,405
kWh
- - -
03 2.5123: Reduce fluid flow rates $9,209 $15,000 $9,209
190,710
kWh
- - -
04 2.5123: Reduce fluid flow rates $13,265 $25,000 $13,265
274,693
kWh
- - -
05 2.5123: Reduce fluid flow rates $4,812 $18,000 $4,812
99,639
kWh
- - -
06 2.2127: Flash condensate to produce lower pressure steam $8,495 $18,038 - $8,495
-
MMBtu
- -
07 4.212: Adopt in-house material generation $228,949 $487,000 - - - $228,949
TOTAL RECOMMENDED $306,640 $591,404 $58,846
1,233,366
kWh
$8,495
-
MMBtu
$2,480 $236,819
TOTAL IMPLEMENTED $6,450 $7,166 $6,450
148,405
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs