Assessment Year | 2011 |
---|---|
Principal Product | Millwork |
NAICS | 321911: Wood Window and Door Manufacturing |
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 185 |
Plant Area |
335,000
ft2
|
Annual Production | 24,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $478,705 | 10,321,625 |
kWh
|
$0.046 |
Electricity Demand | $111,593 | 20,976 |
kW-mo/yr
|
$5.32 |
Natural Gas | $44,613 | 8,825 |
MMBtu
|
$5.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $306,640 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,450 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $35,460 | $21,200 |
$25,110
519,920
kWh
|
- | $2,480 | $7,870 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,450 | $7,166 |
$6,450
148,405
kWh
|
- | - | - | |
03 | 2.5123: Reduce fluid flow rates | $9,209 | $15,000 |
$9,209
190,710
kWh
|
- | - | - | |
04 | 2.5123: Reduce fluid flow rates | $13,265 | $25,000 |
$13,265
274,693
kWh
|
- | - | - | |
05 | 2.5123: Reduce fluid flow rates | $4,812 | $18,000 |
$4,812
99,639
kWh
|
- | - | - | |
06 | 2.2127: Flash condensate to produce lower pressure steam | $8,495 | $18,038 | - |
$8,495
-
MMBtu
|
- | - | |
07 | 4.212: Adopt in-house material generation | $228,949 | $487,000 | - | - | - | $228,949 | |
TOTAL RECOMMENDED | $306,640 | $591,404 |
$58,846
1,233,366
kWh
|
$8,495
-
MMBtu
|
$2,480 | $236,819 | ||
TOTAL IMPLEMENTED | $6,450 | $7,166 |
$6,450
148,405
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs