ITAC Assessment: MS0153
ITAC logo
ITAC Assessment: MS0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Upholstered Wood Furniture
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 255
Plant Area 160,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,190 2,091,442
kWh
Electricity Demand $63,898 7,534
kW-mo/yr
Electricity Fees $7,230 -
Natural Gas $18,569 3,358
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,612 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,103

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,745 $1,384 $3,690
111,665
kWh
- $55 - - -
02 2.3212: Optimize plant power factor $4,678 $4,725 - - $4,678 - - -
03 2.4221: Install compressor air intakes in coolest locations $1,254 $322 $386
11,723
kWh
$850
-
kW-mo/yr
$18 - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,107 $1,552 $949
28,722
kWh
$1,126
-
kW-mo/yr
$32 - - -
05 2.7261: Install timers and/or thermostats $9,517 $3,600 $9,376
283,705
kWh
- $141 - - -
06 2.7241: Install outside air damper / economizer on hvac unit $16,003 $27,300 $15,766
477,140
kWh
- $237 - - -
07 3.7196: Use re-usable filters $735 $560 - - - - $21
-
lb
$714
08 3.2123: Convert to high volume low pressure (hvlp) paint guns $10,573 $3,540 - - - $10,573
-
gal
- -
TOTAL RECOMMENDED $48,612 $42,983 $30,167
912,955
kWh
$1,976
-
kW-mo/yr
$5,161 $10,573
-
gal
$21
-
lb
$714
TOTAL IMPLEMENTED $21,103 $11,201 $4,639
140,387
kWh
$1,126
-
kW-mo/yr
$4,765 $10,573
-
gal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs