| Assessment Year | 2000 |
|---|---|
| Principal Product | Heat Exchangers |
| NAICS |
n/a
|
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
217,000
ft2
|
| Annual Production | 57,200
pieces
|
| Production Hrs. Annual | 7,440
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $258,243 | 5,770,223 |
kWh
|
$0.045 |
| Electricity Demand | $41,569 | 11,833 |
kW-mo/yr
|
$3.51 |
| Electricity Fees | $(-20,484.0) | - |
|
- |
| Natural Gas | $60,423 | 17,310 |
MMBtu
|
$3.49 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,198 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,429 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $331 | $136 |
$362
10,551
kWh
|
$52
-
kW-mo/yr
|
$(-83.0) | - | - | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,518 | $457 |
$11,816
343,787
kWh
|
- | $(-3,298.0) | - | - | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $3,651 | $3,747 | - | - | - |
$3,651
-
MMBtu
|
- | - | - | |
| 04 | 2.7261: Install timers and/or thermostats | $3,911 | $2,652 |
$5,426
157,972
kWh
|
- | $(-1,515.0) | - | - | - | - | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $1,407 | $4,000 | - | - | - |
$1,407
-
MMBtu
|
- | - | - | |
| 06 | 3.6124: Burn waste oil for heat | $432 | $1,974 | - | - | - |
$232
-
MMBtu
|
- |
$200
-
gal
|
- | |
| 07 | 3.4111: Use closed cycle process to minimize waste water production | $8,948 | $4,500 | - | - | - | - |
$3,029
-
Tgal
|
- |
$5,919
-
Tgal
|
|
| TOTAL RECOMMENDED | $27,198 | $17,466 |
$17,604
512,310
kWh
|
$52
-
kW-mo/yr
|
$(-4,896.0) |
$5,290
-
MMBtu
|
$3,029
-
Tgal
|
$200
-
gal
|
$5,919
-
Tgal
|
||
| TOTAL IMPLEMENTED | $12,429 | $3,109 |
$17,242
501,759
kWh
|
- | $(-4,813.0) | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs