ITAC Assessment: OK0853
ITAC logo
ITAC Assessment: OK0853
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Signs and graphic solutions
NAICS 541430: Graphic Design Services
SIC 3993: Signs and Advertising Specialties
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 179,100
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 4,420
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,197 7,684,850
kWh
Electricity Demand $133,886 13,953
kW-mo/yr
Natural Gas $56,170 10,369
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,383

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $26,647 $7,150 $26,647
683,256
kWh
- -
02 2.7241: Install outside air damper / economizer on hvac unit $5,649 $4,550 $5,649
144,850
kWh
- -
03 2.7232: Replace existing hvac unit with high efficiency model $4,083 $15,925 $2,873
73,647
kWh
$1,210
-
kW-mo/yr
-
04 2.7211: Clean and maintain refrigerant condensers and towers $4,173 $240 $2,741
70,278
kWh
$1,432
-
kW-mo/yr
-
05 2.7231: Use radiant heater for spot heating $6,694 $16,250 - - $6,694
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $763 $5,865 $460
11,792
kWh
$303
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,264 $12,032 $762
19,527
kWh
$502
-
kW-mo/yr
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,210 $300 $1,210
31,034
kWh
- -
09 2.3212: Optimize plant power factor $3,767 $7,526 - $3,767
-
kW-mo/yr
-
TOTAL RECOMMENDED $54,250 $69,838 $40,342
1,034,384
kWh
$7,214
-
kW-mo/yr
$6,694
-
MMBtu
TOTAL IMPLEMENTED $5,383 $540 $3,951
101,312
kWh
$1,432
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs