ITAC Assessment: MS0146
ITAC logo
ITAC Assessment: MS0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Compression Molded Drain Pans
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area 840,000
ft2
Annual Production 840,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,435 1,315,944
kWh
Electricity Demand $23,981 3,336
kW-mo/yr
Electricity Fees $3,698 -
Natural Gas $1,675 301
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,866

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.3212: Optimize plant power factor $2,236 $2,610 - - $2,236 - -
02 2.7261: Install timers and/or thermostats $50 $119 $49
1,465
kWh
- $1 - -
03 2.7134: Use photocell controls $276 $222 $272
8,206
kWh
- $4 - -
04 2.4221: Install compressor air intakes in coolest locations $635 $89 $328
9,965
kWh
$297
-
kW-mo/yr
$10 - -
05 2.7135: Install occupancy sensors $192 $346 $189
5,569
kWh
- $3 - -
06 2.7241: Install outside air damper / economizer on hvac unit $4,736 $4,200 $4,666
140,680
kWh
- $70 - -
07 2.2511: Insulate bare equipment $2,189 $2,446 $2,157
46,600
kWh
- $32 - -
08 3.7196: Use re-usable filters $4,800 $648 - - - - $4,800
09 4.821: Pay bills on time to avoid late fees $16 - - - - - $16
10 4.444: Install system to collect scrap $4,000 $5,246 - - - $4,000 -
TOTAL RECOMMENDED $19,130 $15,926 $7,661
212,485
kWh
$297
-
kW-mo/yr
$2,356 $4,000 $4,816
TOTAL IMPLEMENTED $8,866 $6,013 $49
1,465
kWh
- $1 $4,000 $4,816
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs