Assessment Year | 1999 |
---|---|
Principal Product | Two-stroke engines |
NAICS |
n/a
|
SIC | 3519: Internal Combustion Engines, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
68,000
ft2
|
Annual Production | 180,000
pieces
|
Production Hrs. Annual | 3,600
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,440 | 4,193,142 |
kWh
|
$0.033 |
Electricity Demand | $142,353 | 14,491 |
kW-mo/yr
|
$9.82 |
Electricity Fees | $11,820 | - |
|
- |
Natural Gas | $23,175 | 4,689 |
MMBtu
|
$4.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,647 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $63,015 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,728 | $790 |
$3,673
111,079
kWh
|
- | $55 | - | - | - | |
02 | 2.3212: Optimize plant power factor | $7,639 | $7,425 | - | - | $7,639 | - | - | - | |
03 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $4,814 | $1,440 | - | - | - |
$4,814
-
MMBtu
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $2,213 | $2,922 | - | - | - |
$2,213
-
MMBtu
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $666 | $389 |
$275
8,206
kWh
|
$381
-
kW-mo/yr
|
$10 | - | - | - | |
06 | 2.7261: Install timers and/or thermostats | $11,408 | $1,299 |
$11,240
340,270
kWh
|
- | $168 | - | - | - | |
07 | 3.6124: Burn waste oil for heat | $5,179 | $4,416 | - | - | - |
$3,459
-
MMBtu
|
$1,720
-
gal
|
- | |
08 | 4.424: Improve space comfort conditioning | $45,000 | $19,688 | - | - | - | - | - | $45,000 | |
TOTAL RECOMMENDED | $80,647 | $38,369 |
$15,188
459,555
kWh
|
$381
-
kW-mo/yr
|
$7,872 |
$10,486
-
MMBtu
|
$1,720
-
gal
|
$45,000 | ||
TOTAL IMPLEMENTED | $63,015 | $25,088 |
$15,188
459,555
kWh
|
$381
-
kW-mo/yr
|
$233 |
$2,213
-
MMBtu
|
- | $45,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs