ITAC Assessment: MS0136
ITAC logo
ITAC Assessment: MS0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Manufactured Homes
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 234
Plant Area 115,185
ft2
Annual Production 2,080
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,165 1,292,497
kWh
Electricity Demand $14,632 6,178
kW-mo/yr
Electricity Fees $10,709 -
Natural Gas $9,205 1,787
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $289,158 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Increase in Production Savings
01 2.4221: Install compressor air intakes in coolest locations $1,570 $133 $1,268
26,671
kWh
$323
-
kW-mo/yr
$(-21.0) - - -
02 2.6231: Utilize controls to operate equipment only when needed $561 $334 $622
12,896
kWh
- $(-61.0) - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,618 $1,130 $6,255
136,577
kWh
- $(-637.0) - - -
04 2.2437: Recover waste heat from equipment $1,296 $3,418 - - - $1,296
-
MMBtu
- -
05 2.6232: Install set-back timers $717 $472 $709
12,309
kWh
- $8 - - -
06 4.514: Re-arrange equipment layout to reduce handling costs $279,396 $26,310 - - - - $10,296 $269,100
TOTAL RECOMMENDED $289,158 $31,797 $8,854
188,453
kWh
$323
-
kW-mo/yr
$(-711.0) $1,296
-
MMBtu
$10,296 $269,100
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs