ITAC Assessment: MS0133
ITAC logo
ITAC Assessment: MS0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Automotive stampings, wheel covers and rings
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 137
Plant Area 258,243
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $429,701 9,262,017
kWh
Electricity Demand $82,958 29,904
kW-mo/yr
Electricity Fees $42,083 -
Natural Gas $220,705 72,536
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,575

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,085 $881 $21,323
486,811
kWh
- $(-1,238.0) - - - -
02 2.4221: Install compressor air intakes in coolest locations $1,403 $360 $970
22,274
kWh
$348
-
kW-mo/yr
$85 - - - -
03 2.7261: Install timers and/or thermostats $534 $236 $567
12,896
kWh
- $(-33.0) - - - -
04 3.4111: Use closed cycle process to minimize waste water production $1,791 $5,795 $129
2,931
kWh
- $(-8.0) - $1,670
-
Tgal
- -
05 3.6124: Burn waste oil for heat $12,299 $16,435 - - - $4,299
-
MMBtu
- $8,000
-
gal
-
06 4.125: $48,956 $6,286 $67
1,758
kWh
- - $12,969
-
MMBtu
$920
-
Tgal
- $35,000
TOTAL RECOMMENDED $85,068 $29,993 $23,056
526,670
kWh
$348
-
kW-mo/yr
$(-1,194.0) $17,268
-
MMBtu
$2,590
-
Tgal
$8,000
-
gal
$35,000
TOTAL IMPLEMENTED $69,575 $7,403 $21,957
501,465
kWh
- $(-1,271.0) $12,969
-
MMBtu
$920
-
Tgal
- $35,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs