ITAC Assessment: MS0127
ITAC logo
ITAC Assessment: MS0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Vinyl Binders
NAICS
n/a
SIC 2782: Blankbooks, Looseleaf Binders and Devices
Sales Range $100
M
to 500
M
# of Employees 550
Plant Area 365,000
ft2
Annual Production 80,000,000
pieces
Production Hrs. Annual 7,584
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $420,932 11,593,494
kWh
Electricity Demand $124,587 27,686
kW-mo/yr
Electricity Fees $(-28,440.0) -
Natural Gas $16,371 3,154
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $303,647 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $168,589

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,685 $1,202 $14,187
450,469
kWh
- $(-2,502.0) - - - - -
02 2.7261: Install timers and/or thermostats $584 $236 $709
22,567
kWh
- $(-125.0) - - - - -
03 2.6214: Shut off pilots in standby equipment $140 $54 - - - $140
-
MMBtu
- - - -
04 2.3191: Use demand controller or load shedder $3,782 $11,500 - $3,726
-
kW-mo/yr
$56 - - - - -
05 2.4221: Install compressor air intakes in coolest locations $393 $101 $360
11,430
kWh
$95
-
kW-mo/yr
$(-62.0) - - - - -
06 3.7196: Use re-usable filters $14,954 $14,960 - - - - $47
-
lb
- - $14,907
07 4.512: Condense operation into one building $115,929 $8,265 $11,198
355,510
kWh
$4,257
-
kW-mo/yr
$(-1,910.0) - - $102,384 - -
08 4.515: Install shelves / racks to utilize unused space $156,180 $23,010 - - - - - - $156,180 -
TOTAL RECOMMENDED $303,647 $59,328 $26,454
839,976
kWh
$8,078
-
kW-mo/yr
$(-4,543.0) $140
-
MMBtu
$47
-
lb
$102,384 $156,180 $14,907
TOTAL IMPLEMENTED $168,589 $24,502 $14,896
473,036
kWh
- $(-2,627.0) $140
-
MMBtu
- - $156,180 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs