ITAC Assessment: UL0137
ITAC logo
ITAC Assessment: UL0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product High Nutrition Pet Food
NAICS
n/a
SIC 2047: Dog and Cat Food
Sales Range $100
M
to 500
M
# of Employees 275
Plant Area 142,000
ft2
Annual Production 313,000,000
lb
Production Hrs. Annual 2,200
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $869,809 18,568,875
kWh
Natural Gas $348,346 146,223
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,321 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,890

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,773 $2,117 $1,773
37,808
kWh
-
02 2.4133: Use most efficient type of electric motors $152 $450 $152
3,224
kWh
-
03 2.3212: Optimize plant power factor $54,149 $37,248 $54,149
-
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $370 $40 $370
7,913
kWh
-
05 2.2121: Increase amount of condensate returned $9,738 $625 - $9,738
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,139 $1,000 - $1,139
-
MMBtu
TOTAL RECOMMENDED $67,321 $41,480 $56,444
48,945
kWh
$10,877
-
MMBtu
TOTAL IMPLEMENTED $9,890 $1,075 $152
3,224
kWh
$9,738
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs