Assessment Year | 1998 |
---|---|
Principal Product | PVC Deckboards and Fencing |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 254 |
Plant Area |
190,000
ft2
|
Annual Production | 22,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $335,917 | 9,889,801 |
kWh
|
$0.034 |
Electricity Demand | $234,433 | 20,879 |
kW-mo/yr
|
$11.23 |
Electricity Fees | $(-4,196.0) | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $204,058 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $195,731 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,571 | $469 |
$2,700
78,253
kWh
|
- | $(-129.0) | - | - | - | - | |
02 | 2.4226: Use / purchase optimum sized compressor | $917 | - |
$963
27,843
kWh
|
- | $(-46.0) | - | - | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,114 | $4,819 |
$3,270
94,666
kWh
|
- | $(-156.0) | - | - | - | - | |
04 | 2.7261: Install timers and/or thermostats | $217 | $708 |
$228
6,448
kWh
|
- | $(-11.0) | - | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,877 | $4,762 |
$1,223
35,463
kWh
|
$748
-
kW-mo/yr
|
$(-94.0) | - | - | - | - | |
06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $3,336 | $1,471 |
$3,503
101,700
kWh
|
- | $(-167.0) | - | - | - | - | |
07 | 2.2511: Insulate bare equipment | $2,615 | $104 |
$2,746
79,719
kWh
|
- | $(-131.0) | - | - | - | - | |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $39,411 | - | - | - | - |
$51,791
-
lb
|
$(-27,000.0) | - | $14,620 | |
09 | 4.711: Initiate a total quality management program | $150,000 | $100,000 | - | - | - | - | - | $150,000 | - | |
TOTAL RECOMMENDED | $204,058 | $112,333 |
$14,633
424,092
kWh
|
$748
-
kW-mo/yr
|
$(-734.0) |
$51,791
-
lb
|
$(-27,000.0) | $150,000 | $14,620 | ||
TOTAL IMPLEMENTED | $195,731 | $101,281 |
$6,637
192,263
kWh
|
- | $(-317.0) |
$51,791
-
lb
|
$(-27,000.0) | $150,000 | $14,620 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs