Assessment Year 1998
Principal Product PVC Deckboards and Fencing
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 254
Plant Area 190,000
ft2
Annual Production 22,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $335,917 9,889,801
kWh
Electricity Demand $234,433 20,879
kW-mo/yr
Electricity Fees $(-4,196.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $204,058 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $195,731

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,571 $469 $2,700
78,253
kWh
- $(-129.0) - - - -
02 2.4226: Use / purchase optimum sized compressor $917 - $963
27,843
kWh
- $(-46.0) - - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,114 $4,819 $3,270
94,666
kWh
- $(-156.0) - - - -
04 2.7261: Install timers and/or thermostats $217 $708 $228
6,448
kWh
- $(-11.0) - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,877 $4,762 $1,223
35,463
kWh
$748
-
kW-mo/yr
$(-94.0) - - - -
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,336 $1,471 $3,503
101,700
kWh
- $(-167.0) - - - -
07 2.2511: Insulate bare equipment $2,615 $104 $2,746
79,719
kWh
- $(-131.0) - - - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $39,411 - - - - $51,791
-
lb
$(-27,000.0) - $14,620
09 4.711: Initiate a total quality management program $150,000 $100,000 - - - - - $150,000 -
TOTAL RECOMMENDED $204,058 $112,333 $14,633
424,092
kWh
$748
-
kW-mo/yr
$(-734.0) $51,791
-
lb
$(-27,000.0) $150,000 $14,620
TOTAL IMPLEMENTED $195,731 $101,281 $6,637
192,263
kWh
- $(-317.0) $51,791
-
lb
$(-27,000.0) $150,000 $14,620
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs