ITAC Assessment: MS0107
ITAC logo
ITAC Assessment: MS0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Automotive Electrical Motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $50
M
to 100
M
# of Employees 382
Plant Area 545,000
ft2
Annual Production 2,700,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $823,986 26,231,536
kWh
Electricity Demand $459,241 50,053
kW-mo/yr
Electricity Fees $1,323 -
Natural Gas $199,055 51,139
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $321,348 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $314,402

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $9,339 $2,000 - - $9,339
-
MMBtu
- - -
02 2.4221: Install compressor air intakes in coolest locations $2,380 $718 $1,425
43,083
kWh
$955
-
kW-mo/yr
- - - -
03 2.7261: Install timers and/or thermostats $1,719 $3,248 $1,719
51,876
kWh
- - - - -
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $96,541 $13,936 $26,834
810,668
kWh
- $69,707
-
MMBtu
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,757 $20,202 $6,757
204,279
kWh
- - - - -
06 2.7135: Install occupancy sensors $3,239 $761 $3,239
97,890
kWh
- - - - -
07 3.5316: Contract a wood pallet recycling company $12,237 - - - - $12,237
-
lb
- -
08 3.1191: Change procedures / equipment / operating conditions $1,327 $1,690 - - - $3
-
lb
- $1,324
09 4.512: Condense operation into one building $187,809 $34,932 $56,934
1,720,106
kWh
$26,196
-
kW-mo/yr
$4,979
-
MMBtu
- $99,700 -
TOTAL RECOMMENDED $321,348 $77,487 $96,908
2,927,902
kWh
$27,151
-
kW-mo/yr
$84,025
-
MMBtu
$12,240
-
lb
$99,700 $1,324
TOTAL IMPLEMENTED $314,402 $74,318 $92,244
2,786,929
kWh
$26,196
-
kW-mo/yr
$84,025
-
MMBtu
$12,237
-
lb
$99,700 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs