Assessment Year | 1998 |
---|---|
Principal Product | Automotive Electrical Motors |
NAICS |
n/a
|
SIC | 3621: Motors and Generators |
Sales Range | $50 M to 100M |
# of Employees | 382 |
Plant Area |
545,000
ft2
|
Annual Production | 2,700,000
pieces
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $823,986 | 26,231,536 |
kWh
|
$0.031 |
Electricity Demand | $459,241 | 50,053 |
kW-mo/yr
|
$9.18 |
Electricity Fees | $1,323 | - |
|
- |
Natural Gas | $199,055 | 51,139 |
MMBtu
|
$3.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $321,348 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $314,402 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,339 | $2,000 | - | - |
$9,339
-
MMBtu
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $2,380 | $718 |
$1,425
43,083
kWh
|
$955
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7261: Install timers and/or thermostats | $1,719 | $3,248 |
$1,719
51,876
kWh
|
- | - | - | - | - | |
04 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $96,541 | $13,936 |
$26,834
810,668
kWh
|
- |
$69,707
-
MMBtu
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,757 | $20,202 |
$6,757
204,279
kWh
|
- | - | - | - | - | |
06 | 2.7135: Install occupancy sensors | $3,239 | $761 |
$3,239
97,890
kWh
|
- | - | - | - | - | |
07 | 3.5316: Contract a wood pallet recycling company | $12,237 | - | - | - | - |
$12,237
-
lb
|
- | - | |
08 | 3.1191: Change procedures / equipment / operating conditions | $1,327 | $1,690 | - | - | - |
$3
-
lb
|
- | $1,324 | |
09 | 4.512: Condense operation into one building | $187,809 | $34,932 |
$56,934
1,720,106
kWh
|
$26,196
-
kW-mo/yr
|
$4,979
-
MMBtu
|
- | $99,700 | - | |
TOTAL RECOMMENDED | $321,348 | $77,487 |
$96,908
2,927,902
kWh
|
$27,151
-
kW-mo/yr
|
$84,025
-
MMBtu
|
$12,240
-
lb
|
$99,700 | $1,324 | ||
TOTAL IMPLEMENTED | $314,402 | $74,318 |
$92,244
2,786,929
kWh
|
$26,196
-
kW-mo/yr
|
$84,025
-
MMBtu
|
$12,237
-
lb
|
$99,700 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs