ITAC Assessment: SD0616
ITAC logo
ITAC Assessment: SD0616
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Sheet Metal
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 43,000
ft2
Annual Production 300,000
units
Production Hrs. Annual 3,900
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,351 289,568
kWh
Electricity Demand $45,283 1,078
kW-mo/yr
Electricity Fees $2,334 -
TOTAL YEARLY COSTS $80,968
RECOMMENDED SAVINGS* $8,147 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,932 $1,479 $1,359
11,798
kWh
$1,525
-
kW-mo/yr
$48
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,172 - $1,172
10,174
kWh
- -
03 2.7145: Install skylights $1,875 $5,370 $883
7,666
kWh
$992
-
kW-mo/yr
-
04 2.7232: Replace existing hvac unit with high efficiency model $2,168 $7,800 $840
7,296
kWh
$1,328
-
kW-mo/yr
-
TOTAL RECOMMENDED $8,147 $14,649 $4,254
36,934
kWh
$3,845
-
kW-mo/yr
$48
TOTAL IMPLEMENTED $5,100 $9,279 $2,199
19,094
kWh
$2,853
-
kW-mo/yr
$48
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs