ITAC Assessment: MS0090
ITAC logo
ITAC Assessment: MS0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Noncurrent-Carrying Wiring Boxes
NAICS
n/a
SIC 3644: Noncurrent-Carrying Wiring Devices
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area 165,000
ft2
Annual Production 43,700,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $290,786 5,445,487
kWh
Electricity Demand $40,251 11,735
kW-mo/yr
Electricity Fees $20,744 -
Natural Gas $173,925 47,935
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,939 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,615

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
01 2.7261: Install timers and/or thermostats $4,329 $5,125 $3,850
101,993
kWh
- $479 - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,624 $8,079 $4,150
88,511
kWh
$459
-
kW-mo/yr
$1,015 - - - -
03 2.4221: Install compressor air intakes in coolest locations $292 $577 $224
6,448
kWh
$33
-
kW-mo/yr
$35 - - - -
04 2.2414: Use waste heat from hot flue gases to preheat $4,931 $2,350 - - - $4,931
-
MMBtu
- - -
05 3.4115: Recover and reuse cooling water $37,143 $7,666 $(-5,278.0)
(-153,576)
kWh
$(-812.0)
-
kW-mo/yr
- - $23,222
-
Tgal
- $20,011
-
Tgal
06 3.6124: Burn waste oil for heat $958 $1,995 - - - $958
-
MMBtu
- - -
07 4.511: Expand operations into unused space $5,005 $672 - - - - - $5,005 -
08 4.515: Install shelves / racks to utilize unused space $1,657 $1,256 - - - - - $1,657 -
TOTAL RECOMMENDED $59,939 $27,720 $2,946
43,376
kWh
$(-320.0)
-
kW-mo/yr
$1,529 $5,889
-
MMBtu
$23,222
-
Tgal
$6,662 $20,011
-
Tgal
TOTAL IMPLEMENTED $16,615 $15,132 $8,000
190,504
kWh
$459
-
kW-mo/yr
$1,494 - - $6,662 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs