ITAC Assessment: MS0072
ITAC logo
ITAC Assessment: MS0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Knit Clothing
NAICS
n/a
SIC 2321: Men's and Boys' Shirts, Except Work Shirts
Sales Range $10
M
to 50
M
# of Employees 163
Plant Area 47,000
ft2
Annual Production 4,024,080
pieces
Production Hrs. Annual 1,944
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,974 1,388,628
kWh
Electricity Demand $44,455 5,177
kW-mo/yr
Electricity Fees $1,512 -
Natural Gas $4,649 970
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,573

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $5,423 $6,967 $5,423
174,971
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,689 $31,313 $2,281
73,564
kWh
$4,408
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $687 $1,037 - - $687
-
MMBtu
- -
04 2.7291: Reschedule and rearrange multiple-source heating systems $3,884 - - $3,884
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $364 $65 $218
2,345
kWh
$146
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,303 $576 $1,303
41,911
kWh
- - - -
07 3.5313: Increase amount of waste recovered for resale $1,654 - - - - $1,654
-
lb
-
08 3.5315: Lease / purchase baler; sell cardboard to recycler $10,146 $11,000 - - - $2,646
-
lb
$7,500
TOTAL RECOMMENDED $30,150 $50,958 $9,225
292,791
kWh
$8,438
-
kW-mo/yr
$687
-
MMBtu
$4,300
-
lb
$7,500
TOTAL IMPLEMENTED $10,573 $31,313 $2,281
73,564
kWh
$8,292
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs