*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Air Handling Units
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 218
Plant Area 80,000
ft2
Annual Production 540
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,966 1,956,624
kWh
Electricity Fees $(-6,712.0) -
Natural Gas $9,824 2,041
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,584 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $3,595 $1,095 - - $3,595
-
MMBtu
- -
02 2.7314: Reduce ventilation air $3,693 $147 $4,387
144,783
kWh
$(-694.0) - - -
03 2.4314: Use synthetic lubricant $331 $80 $404
13,189
kWh
$(-73.0) - - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $6,149 $10,240 $7,304
241,208
kWh
$(-1,155.0) - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,776 $576 $2,108
69,754
kWh
$(-332.0) - - -
06 2.7261: Install timers and/or thermostats $1,990 $1,160 $2,364
77,960
kWh
$(-374.0) - - -
07 3.8135: Use low voc or water based paint $43,050 $238 - - - $6,800
-
gal
$36,250
TOTAL RECOMMENDED $60,584 $13,536 $16,567
546,894
kWh
$(-2,628.0) $3,595
-
MMBtu
$6,800
-
gal
$36,250
TOTAL IMPLEMENTED $11,385 $3,058 $9,263
305,686
kWh
$(-1,473.0) $3,595
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs