Assessment Year | 1996 |
---|---|
Principal Product | Air Handling Units |
NAICS |
n/a
|
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 218 |
Plant Area |
80,000
ft2
|
Annual Production | 540
pieces
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $113,966 | 1,956,624 |
kWh
|
$0.058 |
Electricity Fees | $(-6,712.0) | - |
|
- |
Natural Gas | $9,824 | 2,041 |
MMBtu
|
$4.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,584 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,385 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $3,595 | $1,095 | - | - |
$3,595
-
MMBtu
|
- | - | |
02 | 2.7314: Reduce ventilation air | $3,693 | $147 |
$4,387
144,783
kWh
|
$(-694.0) | - | - | - | |
03 | 2.4314: Use synthetic lubricant | $331 | $80 |
$404
13,189
kWh
|
$(-73.0) | - | - | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,149 | $10,240 |
$7,304
241,208
kWh
|
$(-1,155.0) | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,776 | $576 |
$2,108
69,754
kWh
|
$(-332.0) | - | - | - | |
06 | 2.7261: Install timers and/or thermostats | $1,990 | $1,160 |
$2,364
77,960
kWh
|
$(-374.0) | - | - | - | |
07 | 3.8135: Use low voc or water based paint | $43,050 | $238 | - | - | - |
$6,800
-
gal
|
$36,250 | |
TOTAL RECOMMENDED | $60,584 | $13,536 |
$16,567
546,894
kWh
|
$(-2,628.0) |
$3,595
-
MMBtu
|
$6,800
-
gal
|
$36,250 | ||
TOTAL IMPLEMENTED | $11,385 | $3,058 |
$9,263
305,686
kWh
|
$(-1,473.0) |
$3,595
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs